Would you guess the same distribution for air asphyxiation slaughter (as I did in my cost-effectiveness analysis of Shrimp Welfare Project’s Humane Slaughter Initiative)? Do you have a guess for the expected duration of air asphyxiation slaughter (I assumed 30 min of disabling pain based on Liu et. al 2014)?
Hi @Hannah McKay🔸 and @William McAuliffe. You assumed the following pain distribution for ice slurry slaughter:
Would you guess the same distribution for air asphyxiation slaughter (as I did in my cost-effectiveness analysis of Shrimp Welfare Project’s Humane Slaughter Initiative)? Do you have a guess for the expected duration of air asphyxiation slaughter (I assumed 30 min of disabling pain based on Liu et. al 2014)?