I’m not sure I follow. In my framework, “how many other dollars have already been poured into solving a problem” is captured by crowdedness, ie., total resources allocated to the problem, ie., the position on the x-axis.
Fair point.
I’m not sure I follow. In my framework, “how many other dollars have already been poured into solving a problem” is captured by crowdedness, ie., total resources allocated to the problem, ie., the position on the x-axis.
Fair point.